top of page

INSTALLATION SUPERVISION

HydroCarbon Processes’ specialists can optionally perform installation supervision of a VOC vapour processing systems, when it has been shipped to the customer’s site.

In this very important phase of the project, the installation of the equipment on the prepared foundation, connecting theVOC vapour processing systems with the interphases at the battery limit, along with loading of the activated carbon to the vessels, is the preparation of next phase – commissioning of the VOC vapour processing systems.

Copyrights © 2014 by HydroCarbon Processes Ltd. All Rights Reserved

bottom of page